Hi all,

I was wondering if anyone has experience with powered-on (hot) migration of Exchange 2013 servers in a VMWare environment using vCenter Server 5.x option "move to".

I need to move my two virtual Exchange 2013 servers (separated CAS & MBX roles) from one host to another, but don't want to power off the servers. I know the "move to" option worked with other servers I have, but the thing is: Exchange 2013 doesn't support snapshots, and during the "move to" process I have seen snapshots being taken and removed which is part of the hot migration.

Hope to hear from you.